国产精品高清在线观看_久久精品夜夜夜夜夜久久_丝袜美腿亚洲一区二区_亚洲v日韩v综合v精品v

Hello, welcome to visit Guangzhou Flying Butterfly Stage Lighting Equipment Co., LTD's official website!
ENGLISH
中文
Language Selection:
TECHNICAL SUPPORT
First to understand the needs of the customers, listen to the customer with an open mind.
After-sales Service Technical Help Download News
The stage lighting equipment maintenance?
Release Date:[2016/6/24 16:50:29]   Total read [3020] Times

Light matters needing attention

 

1 and half an hour before the opening, open all equipment, low temperature preheating, test all the equipment and lines at the same time. Low temperature state refers to a dim light can;

 

2, warmed up after fifteen minutes to zero in all equipment, equipment cooling, cooling time not less than 15 minutes;

 

3, after cooling, can be formally entered the stage of music performance;

 

4, the performance, after the guests leave, lighting engineer should shut down all equipment, and make the equipment cooling 15 to 20 minutes, then equipment for storage or mask, juicers before departure.

 

Lighting equipment maintenance is more complicated than the level of sound, is trivial, basically do daily routine detection, regular weekly, monthly equipment maintenance and debugging appropriately;

 

Conventional detection range includes:

 

1, whether or not the bulb light properly;

 

2, all the devices of attachment is normal;

 

3, all the equipment whether can normal use, including light switch, color changer control, motion and so on is normal,

 

4, DMX512 signal whether can normal control lamps and lanterns;

 

5, special equipment is normal use, and fill them with the required materials, such as: machine, fog machine, snow machine, bubble machine, etc.

 

Regular testing

 

Regular testing in addition to routine monitoring all project also note the following points

 

1, in the weeks to detect when the connection to the main test equipment, including power cords, DMX512 cords, etc., and see whether there is loose, whether there is a breakpoint, etc.

 

2, when tested for weeks at the same time, should be more fully adjust the lamp and DMX512 programming;

 

Monthly equipment maintenance and proper adjustment

 

An appropriate adjustment of the every month in addition to routine monitoring and testing of all work a week, it will be a very meticulous work, need to coordinate multiple departments, such as actors, band, weak current, security, cleaning, etc., at the same time in the month test, to complete the following work.

 

1, light adjustment; Because in use there will be a part of the lamp, the change of movement or guest area lead to light changes, so in each month for the adjustment of the equipotential, of course, also include DMX512 signal control amount;

 

2, the testing of mechanical equipment, including the amount of motor, the color changer, special equipment of nozzle, etc.

 

3, check all the lines. To detect whether there is a breakpoint, breakage, leakage, because some human factors is in use to avoid lines appear all sorts of unexpected circumstances, such as ferrous wire is breaking, often plug wire, or about breakpoints, occasionally because and beverage line leakage or short circuit, etc., so the test should be very careful. The weak current testing needed to cooperate to complete;

 

4, clean lamps and lanterns of internal and external dust and garbage. Light itself will have some rubbish in use, such as residue inside the lamp bulb explosion of garbage, or other foreign minister time teach, special effects in the audience area machinery easy to fall into some rubbish, such as ribbon bar, scales, drinks the residual liquid, and so on. So be scraped clean lamps and lanterns outside of garbage and sewage, and clear the trash inside the lamp, this link need cleaning to cooperate;

 

5, check all fire protection equipment. Lighting, audio circuits is one of the most concentrated in the type of work, high voltage into the weak current, relevant equipment, related wire more, so fire is a top priority in the lights work, in the monthly routine check, should cooperate with security department, for all fire protection facility, fire fighting equipment to conduct a comprehensive inspection, monitoring scope includes the normal degree of fire-fighting equipment, fire fighting equipment choice whether normal, whether in the warranty period, etc.

 

In addition to the daily monitoring, test every week, every month comprehensive inspection, lighting engineers must know about all of the equipment and the environment is very, do please timely treatment, so as to have the good visual environment at the same time there is enough security.

【Font:Big Middle Small】【Printing this page】 【Back】【Top】【Close
CONTACT US

Service Hotline: 18922706009   Whatsapp:+8618922706009

E-mail:wfw04@163.com
Addr.:No.2, Qinglong Dongyi Street, Dalongtou Village, Jianggao Town, Baiyun District, Guangzhou
Website: http://www.m.818laserhub.com

SHARE
粵ICP備19113232號

友情鏈接

主站蜘蛛池模板: 久久久91精品国产| 在线丝袜欧美日韩制服| 国产一区二区丝袜| 欧美精品一区二区性色a v| 国产精品九九九| 国产精品成av人在线视午夜片| 国产欧美日韩免费看aⅴ视频| 国产精品久久久久av| 国产成人免费91av在线| 中文字幕一区二区三区四区五区六区| 91极品视频在线| 欧美在线不卡区| 久久精品国产亚洲精品| 国产精品第一视频| 日本在线视频不卡| 国产一区视频在线| 91av在线不卡| 欧美亚洲国产另类| 国产精品高清在线| 日韩av观看网址V| 久久精品午夜福利| 91精品国产91久久久久青草| 日本午夜精品电影| 国产精品免费网站| 日韩一区二区三区高清| 国产在线播放一区二区| 亚洲精品在线视频观看| 精品国产一区二区三区在线| 中文精品一区二区三区| 国产一区二区视频在线观看| 日韩中文字幕在线视频| 国产亚洲综合视频| 日本欧洲国产一区二区| 亚洲综合在线小说| 精品亚洲第一| 日韩亚洲欧美中文在线| 国产99在线免费| 国产视频不卡| 国产一区香蕉久久| 国产专区在线视频| 久久天天躁狠狠躁夜夜爽蜜月|
Service
Service